Electrical dashboard Permit needs The on-line permit is obtainable for nature in betterworld2016.org through a residential zoning district. Zoning district information is available on-line by clicking on E-Zoning.

You are watching: Size of wire for 200 amp service

This permit will allow replacement the the existing electrical panel up to a preferably of 200 amps in the same location.Note: some properties in betterworld2016.org have an underground electric power feeding from PG&E. If your property has an underground power feed, verify through PG&E that they can administer increased strength for a larger panel size.To recognize if the proposed dashboard is sized appropriately for your requirements OR if you want to see if the proposed dashboard is big enough because that an all-electric house, please finish an electrical panel sizing spreadsheet. An electric permit is required for replacement and also upgrade of the main electrical business panel before installation that the new panel. Complying with is a listing of the basic requirements for electric panel replacements based on the 2019 California electric Code. This catalog is intended to carry out general information, call the structure Safety department for any type of questions or extr information.General Requirements - The main electrical organization shall be mounted with rigid conduit. Electric metallic tubing might be offered where the service drop is attached to the building. The business entrance cable might be used, detailed the approved fittings are supplied with the cable, such together a rain-tight service head or developing the cable goose-neck, recorded or painted, and held securely in location by a fitting authorized for the purpose. (Article 230)The minimum size service conduit shall be 1-1/4”. The minimum size company entrance wire shall it is in rated 100 amperes minimum for solitary family dwellings. For single family homes, the company disconnect means shall have actually a rating of less than 100 amperes, 3-wire. A larger business may be compelled for brand-new homes or additions to currently homes based on the actual load calculations. (CEC 230.79(C))Service entrance Conductors (Wires) – Conductors that extend across a roof shall have actually a minimum vertical clearance of 3’ above the roof surface for roofs sloped 4:12 or more (18” clearance forced when conductors enter through the roof overhang/eave). The business head candlestick be located so the the company drops, in addition to the open up wires between the service head and service drop, will have actually a minimum clearance that 10’ vertically over ground and 3’ radius from doors and windows. (Article 230.24)The neutral (grounded) conductor need to be figured out with white tape at both terminals. (Article 200.6(B)(4))Service entrance conductors and also cables candlestick be authorized for a wet place and, when exposed to direct sunlight, chandelier be noted and significant as “sunlight resistant.” company entrance conductors and conduit chandelier be sized according to the complying with table (based top top CEC chapter 9 table 1):
SERVICE entrance CONDUCTORS SIZE and RATING
Service or Feeder RatingCopper ConductorsAluminum or Copper-CladAluminumMinimum ConduitSize
100 Amps#4 AWG#2 AWG1 ¼ inch
125 Amps#2 AWG#1/0 AWG1 ¼ inch
150 Amps#1 AWG#2/0 AWG1 ¼ inch
200 Amps#2/0 AWG#4/0 AWG1 ½ inch
The grounding conductors must be figured out by white or grey tape at both end (200.6).Meter location - PG&E requires the elevation of the meter to it is in 48” to 66” above the ground. PG&E prohibits brand-new meters ~ above exterior walls surrounding to bedrooms or bedroom closets. A minimum horizontal clearance that 36” native the gas meter and piping is required.

See more: What Is A Standard Double Room And Do All Of, Standard Double Room

Working space - The clear working room in prior of the panel shall be 30” vast by 36” deep v a minimum headroom clearance of 6’-6” (Article 110.26)Grounding of Services - ground connection shall consists a constant grounding electrode conductor operation from the dashboard to a ground rod (grounding electrode) and also to the cold water pipe. Grounding of the electrical business at the key water line have to be in ~ the first 5’ the water piping into the building. The secret water company shall not be provided as the grounding electrode without supplemental electrode. For brand-new structures and enhancements to currently structures, a concrete encased floor electrode shall it is in installed. This chandelier consist of 20’ that ½” bare or zinc-coated rebar or ceiling copper wire in the section of the footing in contact with earth. (CEC 250.52(A)(3)(1) and also 250.52(A)(3)(2))For existing structures, the ground connection electrode shall be nonferrous (copper), listed, and also not be much less than 5/8” in diameter. The electrode chandelier be set up such the at the very least 8’ of length is in contract through the soil. The upper finish of the electrode shall it is in flush v or listed below ground level unless the above-ground end and the grounding electrode conductor attachments is protected against physical damage. (CEC 250.52 (A)(5), 250.64(B))The required grounding electrode conductor (from electrode to panel) size is provided in the following table:
GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66)
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#8 AWG#6 AWG
150 Amps#6 AWG#4 AWG
200 Amps#4 AWG#2 AWG
Bonding - Bonding the the hot, cold, and also gas present is required when the electric panel is replaced. Bonding of the hot, cold, and also gas present is forced with water business replacements (if making use of a much less conductive product than is existing) and for every re-pipes. Bonding candlestick consist that a consistent bond jumper mounted at the water heater in between the hot, cold, and also gas lines. The bonding jumper shall be sized based upon the complying with table. (CEC250.4(A)(4))
BONDING JUMPER SIZING (Table 250.102(C)(1))
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#6 AWG#4 AWG
150 Amps#6 AWG#4 AWG
200 Amps#6 AWG#4 AWG
The electric Panel permit is NOT available on-line if you are: installation the brand-new electrical dashboard in a various location. installation a brand-new electrical panel larger than 200 amps. Installing additional sub-panels with the brand-new electrical panel. Performing extr electrical occupational in conjunction through the new electrical panel installation.
If any of the above conditions apply, the permit shall it is in issued in ~ the One-Stop permit Center, City Hall, 456 W Olive Avenue. Specific procedure information is obtainable at the Building division web site.
InspectionsA minimum of two inspections are required, a utility release and also a final. The utility release inspection should be scheduled once the brand-new panel is installed and also ready to be hooked up the PG&E supply. The structure inspector will carry out a utility release kind which will must be detailed to PG&E to have the supply hooked approximately the brand-new panel. A cable lath investigate is forced for stucco repairs. A last inspection need to be reserved after every one of the occupational is complete.
*